Posted on

Festival of Quilts Countdown 4

Quilting Progress
It seems like not much to report this week but progress has been made – it’s just that I was quilting and finishing quilts rather than, for me, the most exciting part of designing new ones.

As I post this Monday morning – Two black OBW quilts are completely finished. The third one, the pink quilt, is finished on the machine quilting front. I still have the binding to do.

I also started hand stitching a few more hexagons. I’ve gone through no they do not join, to yes they do, back to no they do not. I know how to get this to work, but I am exploring a different design for them.

Behind the Scenes
Apart from quilting, taking a trade stand involves a lot more behind the scenes work. Thinking about the design of the space, how to hang quilts, pricing up products. Remembering to order everything and have ready all types of hanging etc. This takes up so much time. This week I designed and had printed the leaflets. You can see all ecourses and tutorials here

What will this week bring?
With just under three weeks to go, I am tempted to finish another quilt. The first one that I designed for the show. This was going to be my showcase so it would be nice to finish it. First task with that is cutting more hexagons or as I said above, changing the design. This is a multi-technique quilt to give your skills a workout. Also on the work schedule are all the wall hangings that need finishing and mounting. That’s a priority too. I am also working on either a BOM, Quilt challenge or something that people can sign up to. I shall be designing this next week. I am thinking about a competition too – this is a great opportunity for visitors. It’s all working out so well. Stand C5 9-12th August at the NEC.

Words, work and images copyright Karen Platt 2018

Posted on

Festival of Quilts 2018 Countdown 2

My second post about work for the Festival of Quilts 2018.

I was beaten by the weather last week. However I now have three quilt tops ready for quilting. The two dark OBW quilts, and the pink one featured here. That feels like an achievement.

It was a week of straightening off fabric, cutting borders and attaching. Sewing backing. I like this finishing off period. Somehow it is very calming in contrast to the frenzy of piecing. Although there is still the frenzy of making sure everything is ordered for the festival.

Before I change to the walking foot, there are at least two more quilt tops in preparation. I would like to get these finished too. I have about two weeks to work on these. That will leave me two weeks to quilt five quilt tops. Sounds like a plan.

Happy quilting everyone. See you on Stand C5 at the biggest quilt show of the year in the U.K., Festival of Quilts, NEC 8-12 August 2018.

Words, work and images copyright Karen Platt 2018